Publication
default pub image
Presentation
The Missions and Means Framework (MMF) is an ideal structure for conducting trade studies. MMF has broad applicability in all aspects of the military decision-making and system acquisition process,...
Publication
default pub image
Presentation
Conference Focus The 28th Annual National T&E Conference is focusing on proper role of T&E in our Defense System Requirements Process. This paper will address: What constitutes a set of valid...
Publication
default pub image
Presentation
The Concept The analytical plan is based on the mission. The data requirements are based on the analytical plan. The test plan is based on the data requirements.
Publication
default pub image
Paper
Because there can be serious negative consequences from acting on erroneous M&S and analysis conclusions, the DOD has developed and is exercising a risk-based process for verifying, validating and...
Publication
default pub image
Paper
When we think of validating models and simulations (M&S), we all think of comparing M&S outputs with test data. But how many of us have ever actually been successful in accomplishing that comparison...
Publication
default pub image
Paper
Background Protecting crew occupants has always been the primary concern for vehicle survivability design. The historical approach to maximizing survivability was to protect the occupants by...
Publication
default pub image
Presentation
In This Presentation Fault Tree Utility Selection Process OpenFTAMV Development Overview of MV Specific Features Future Plans Demonstration
Technology Spotlight
ARL WMRD Underbody Blast Work
SURVICE provides Modeling and Simulation (M&S), and Live Fire Vulnerability Testing (LFVT) support to the warfighter, increasing combat and tactical vehicle crew survivability with quantified...
Publication
default pub image
Presentation
The goal of SURVICE Metrology is to establish a world-class business unit that provides integrated metrology solutions, dimensional inspection and modeling services, custom engineered solutions, and...
Publication
default pub image
Presentation
Abbreviated Definition: The ability to be mission capable after an encounter with a hostile threat Requirements for UAS survivability will morph and grow as their applicability transitions from a...
Publication
default pub image
Presentation
Topics What does “Mission-Based” really mean? The “Building Block Approach” to LFT&E A Post-Shot Interview with an Anthropomorphic Simulator Parting Shots (Pun Intended)
Technology Spotlight
CH-53K
This SURVICE project focused on the Vulnerability reduction of the CH-53K based on analysis of its structure, gearboxes, armor, fuel system, drive shafts, pitch rods, fire protection, hydraulic system...
Publication
default pub image
Presentation
Next Generation Heavy Lift Helicopter for the US Marine Corps (CH-53E vs CH-53K) Operational Requirements Survivability Key Performance Parameters Air Vehicle Specification
Publication
default pub image
Paper
We present a test and evaluation methodology for rotorcraft airworthiness qualification of actual navigational performance using statistical tolerance and techniques for bounding confidence. The...
Publication
default pub image
Presentation
“End Game” Methodology has applicability beyond current use on CH-47F Helicopter CH-47F is only first of several U.S Army Helicopters to seek RNP RNAV Certification Provides a more understandable and...
Publication
default pub image
Paper
The Department of Defense (DOD) is exercising a risk-based process for verifying, validating and accrediting models and simulations (M&S) used in system acquisition. Test and laboratory facilities can...
Publication
default pub image
Presentation
What Is LESAT? LESAT - Lightning Effects Structure Analysis Tool Computational methodology implemented in MATLAB to analytically predict actual transient current levels and voltages on aircraft wiring...
Publication
default pub image
Presentation
Background CERDEC conducted a power assessment in 2008 Three Command Posts (CPs): the Brigade Main, the Infantry Battalion CP and the MAIN Tactical CP. Eight days of mission equipment operation. AMSAA...